A Process takes inputs and transforms them into outputs, and may be connected to other Processes in process flows. The work of Work - Information mining contributes to This Process.

A Process happens in an organizational Context.
Context: The Project Green Wall
This process fulfills a Work order.
Order: Work order 348 , Educational version of Green Wall Prototyping due: 2023-05-15

Previous processes:

This Process:

Educational version of Green Wall Prototyping starting 2022-11-08 ending 2023-05-15

Developing a Green Wall version that will be deployed in educational settings / institutions.

We document here.
https://docs.google.com/document/d/1y-k6o0i5y-kEWjnsvqxxM8-_L9KO8gnI9ZAsq0UWX48/edit#

Input requirements:

Time Contribution Work - Documenting 1.00 Time - Hours

Work on creating documentation about the advancement of the development work. Documentation goes here
https://docs.google.com/document/d/1y-k6o0i5y-kEWjnsvqxxM8-_L9KO8gnI9ZAsq0UWX48/edit#

Time Contribution Work - Information mining 1.00 Time - Hours

Time spent searching for parts on the Internet, reading about similar systems, etc.
Requires harvesting (documentation of findings)
https://groups.diigo.com/group/sensorica-knowledge/content/tag/green_walls_project

Time Contribution Work - Transportation 1.00 Time - Hours

Time when, for example, we take the Green Wall and move it to another location for a demo.
Or time spent getting parts from the store and transporting them at the lab, for example.

Time Contribution Work - Facilitation and coordination 1.00 Time - Hours

Time spent on communicating with peers, on Discord or email or other.
Also, planning for meetings and coordinating activities.

Time Contribution Work - R&D mechanics 50.00 Time - Hours

Time spent on development activities, such as design and prototyping. The act of documentation is logged under "Documentation"

Time Contribution Work - Technician experimental 1.00 Time - Hours

Testing, troubleshooting or any other skill that is not too qualified to go under the R&D task, where actual design and development is done. This is mostly work that follows simple instructions or protocols.

Time Contribution Work - Recruiting 1.00 Time - Hours

Log time spent talking to strangers about the project and helping them join the project.

Time Contribution Work - Training others 1.00 Time - Hours

Spend time teaching new contributors.

Time Contribution Work - Training self 1.00 Time - Hours
Time Contribution Work - Meeting 1.00 Time - Hours

Time spent in meetings with peers, potential stakeholders (including customers), etc.

Time Contribution Work - R&D electronics 1.00 Time - Hours
Time Contribution Work - Shopping 1.00 Time - Hours
Resource use Equipment - Electronic - Multimeter 1.00 Each
Resource use Equipment - Mechanical - Power tools 1.00 Each
Resource use Equipment - Electronic - Oscilloscope 1.00 Each
Resource use Equipment - Optical powermeter 1.00 Each
Resource use Equipment - Electronic - Heat gun 1.00 Each
Citation Prototype material
Citation Design Electronic

Output plans:

Document - Lesson 1.00 Idea
Document - Project or process documentation 1.00 Idea
Design Electronic 1.00 Idea
Document - User Guide 1.00 Each
Document - Bill of materials 1.00 Idea
Document - Presentation 1.00 Idea

Next processes: