Process: Make Joint-type transducer prototype starting 2014-02-12 ending 2014-02-12

If you were logged in and working on this process, you would log your work on this page.

Outputs

Scheduled:

Joint-type transducer prototype 1.00 Each due Feb. 12, 2014
Completed: produces 1.00 Each July 24, 2014
  Resource: Joint-type transducer prototype: Joint-type transducer glass fiber 18.00 Each

Work

Planned Work: (Requirements are ordered by due date)

R&d chemistry work: 8.00 Time - Hours due Feb. 12, 2014

planning experiments, discussed a new design to replace the shrinking tube.
fiber preparation for silvering (mirrors), fiber striping, cleaving, mirroring with shaking technique and control under microscope.

Taken by Francois
Work events:
Feb. 13, 2014 8.00 Time - Hours Done by Francois

with Christopher,

planning experiments, discussed a new design to replace the shrinking tube.
fiber preparation for silvering (mirrors), fiber striping, cleaving, mirroring with shaking technique and control under microscope.

Technician experimental work: 1.00 Time - Hours due Feb. 12, 2014
Unassigned
R&d optics work: 1.00 Time - Hours due Feb. 12, 2014
Unassigned
R&d mechanics work: 1.00 Time - Hours due Feb. 12, 2014
Unassigned

Citations

Joint-type transducer prototype

Consumable Inputs

Optical fiber: 1.00 Length - Meter due Feb. 12, 2014
Onhand: 125/63.5 MM glass Corning Infinicor 300 ~ 18.08 Length - Meter
Onhand: PMMA 0.25 mm SK ~ 95.85 Length - Meter
Onhand: PMMA 0.5 mm SK ~ 97.88 Length - Meter
Onhand: PMMA 1mm CK ~ 19.49 Length - Meter

Usable Inputs

Lab (space): 1.00 Area - square meters due Feb. 12, 2014
Onhand: Space - Frederic D's lab 200.00 Area - square meters
Onhand: Space - Makxim's lab 100.00 Area - square meters
Onhand: Space - Phil's lab 25.00 Area - square meters
Onhand: Space - SENSORICA Montreal lab 250.00 Area - square meters
Onhand: Space - SENSORICA Robotics lab 1000.00 Area - square meters
Silver reducer concentrate: 1.00 Volume - mL due Feb. 12, 2014
Silver solution concentrate: 1.00 Volume - mL due Feb. 12, 2014
Fiber splicer: 1.00 Each due Feb. 12, 2014
Onhand: Field Fiber Splicer 2.00 Each
Silver activator concentrate: 1.00 Volume - mL due Feb. 12, 2014
Microscope : 1.00 Each due Feb. 12, 2014
Onhand: Confocal Dilson's 1.00 Each
Onhand: Confocal Phil's 1.00 Each
Onhand: Inverted Phil 1.00 Each
Onhand: Microscope inverted Dilson 4.00 Each
Onhand: Stereo microscope - large Phil 1.00 Each

Process context:

Pattern: Generic R&D
Context: 2D strain transducer
Order: Work order 110 , Make Joint-type transducer prototype due: 2014-02-12

Previous processes:

Next processes: