Process: Design and produce a portable sauna starting 2021-01-01 ending 2021-03-01

If you were logged in and working on this process, you would log your work on this page.

Outputs

Scheduled:

Prototype material 1.00 Each due March 1, 2021
Completed: produces 1.00 Each Feb. 10, 2021
  Resource: Prototype material: Portable Sauna Design and Prototyping 1.00 Each

Work

Planned Work: (Requirements are ordered by due date)

Work - R&D mechanics: 1.00 Time - Hours due Jan. 1, 2021
Unassigned
Work events:
March 23, 2021 2.00 Time - Hours Done by Alex Dicu

Completed the wood panels cover, rope, glue.

Feb. 23, 2021 4.00 Time - Hours Done by Tibi

Prototyping work with Alex at the lab, assembly of the structure according to the 3D model.

Feb. 16, 2021 5.00 Time - Hours Done by Tibi

3D modeling: small sauna design.

Feb. 8, 2021 8.00 Time - Hours Done by Tibi

3D modeling of final design version, before prototyping. 3D model saved in project folder.
https://drive.google.com/drive/folders/1K32XQ772Z4rfjklRQF9_Ul_XToSlBmHM?usp=sharing

Feb. 4, 2021 4.00 Time - Hours Done by Alex Dicu

Design considerations, meeting with Tibi.
Work recorded in the project development.
https://docs.google.com/document/d/1oxwqA1NBgCzqHZENyWePKUltOa8nx7eaM2-pIi_B5sk/edit

Jan. 4, 2021 4.00 Time - Hours Done by Tibi

Design considerations, meeting with Alex.
Work recorded in the project development.
https://docs.google.com/document/d/1oxwqA1NBgCzqHZENyWePKUltOa8nx7eaM2-pIi_B5sk/edit

Work - Artistic: 50.00 Time - Hours due Feb. 28, 2021

Video production, publication and improved aesthetics of documentation.

Unassigned
Work events:
Feb. 16, 2021 0.80 Time - Hours Done by Tibi

Produced video, published, and improved aesthetics in documentation.
With Alex at the lab.

Work - Analysis and Strategy: 5.00 Time - Hours due March 1, 2021

Put this project into a sustainable business perspective.

Unassigned
Work events:
Feb. 8, 2021 2.00 Time - Hours Done by Tibi

Compounded time for brainstorming and business modeling, orientation of the design to match these considerations. All went into the documentation as system requirements.
Impact on Sensorica.

Work - Technician experimental: 30.00 Time - Hours due March 1, 2021

Prototyping, assembling prototype, follow design.

Unassigned
Work events:
April 21, 2021 4.00 Time - Hours Done by Alex Dicu

Worked more at the lab with Tibi, prototyping, modified the box for the oven, built a new chair.

April 20, 2021 7.00 Time - Hours Done by Tibi

Worked more at the lab with Alex, prototyping, modified the box for the oven, built a new chair. After Alex left, I built a transportation rig for the Sauna. I also strengthened the door of the sauna. I also worked on the electrical cable and made the proper connections to the stove.

April 19, 2021 4.00 Time - Hours Done by Alex Dicu

Worked with Tibi, making chairs and a box for the stove.

April 19, 2021 4.00 Time - Hours Done by Tibi

Worked with Alex, making chairs and a box for the stove.

March 24, 2021 3.00 Time - Hours Done by Tibi

Mounted the structure, found a way to make it sturdy by designing a diagonal strapping method. Cut wood panels cover in 3 parts, found a way to connect the parts together. tested.

March 23, 2021 3.00 Time - Hours Done by Alex Dicu

worked with Tibi on prototyping, corrected a few mistakes and completed the wood covering.

March 22, 2021 3.00 Time - Hours Done by Tibi

worked with Alex on prototyping, corrected a few mistakes and completed the wood covering.

March 16, 2021 3.00 Time - Hours Done by Alex Dicu

Worked on the wood covering at the lab, alone.

March 9, 2021 3.00 Time - Hours Done by Alex Dicu

Continued to work with Tibi on the structure, trimming of elements to incorporate aluminum reinforcement against bending.

March 9, 2021 5.00 Time - Hours Done by Tibi

Continued to work on the structure, trimming of elements to incorporate aluminum reinforcement against bending.

March 8, 2021 4.00 Time - Hours Done by Tibi

Worked on the structure, correcting some issues with it, adding a tissue on the sides to make it more resistant to split.
Also painting of parts.
worked with Alex.

March 8, 2021 4.00 Time - Hours Done by Alex Dicu

Worked on the structure, correcting some issues with it, adding a tissue on the sides to make it more resistant to split.
Also painting of parts.
worked with Tibi.

March 3, 2021 5.00 Time - Hours Done by Alex Dicu

Worked with Tibi on building the prototype.
We did the covering of the sauna,

March 3, 2021 5.00 Time - Hours Done by Tibi

Worked with Alex on building the prototype.
We did the covering of the sauna,

March 2, 2021 3.00 Time - Hours Done by Alex Dicu

Worked with Tibi on building the prototype.

March 2, 2021 3.00 Time - Hours Done by Tibi

Worked with Alex on building the prototype.

March 1, 2021 5.00 Time - Hours Done by Tibi

Worked with Alex on building the prototype.

Feb. 24, 2021 4.00 Time - Hours Done by Alex Dicu

Prototyping work with Tibi at the lab, assembly of the structure according to the 3D model.

Feb. 23, 2021 8.00 Time - Hours Done by Tibi

Prototyping work at the lab, assembly of the structure according to the 3D model. Alex went home.

Feb. 22, 2021 7.00 Time - Hours Done by Tibi

Prototyping work with Alex at the lab, assembly of the structure according to the 3D model.

Feb. 22, 2021 7.00 Time - Hours Done by Alex Dicu

Prototyping work with Tibi at the lab, assembly of the structure according to the 3D model.

Feb. 17, 2021 4.00 Time - Hours Done by Tibi

Prototyping at the lab with Alex. Mostly cutting parts according to the 3D plan.

Feb. 17, 2021 4.00 Time - Hours Done by Alex Dicu

Prototyping at the lab with Tibi. Mostly cutting wood parts according to the 3D plan.

Feb. 3, 2021 8.00 Time - Hours Done by Tibi

Worked on the first prototype.
Cutting, assembling of parts, following design.

Feb. 2, 2021 8.00 Time - Hours Done by Tibi

Worked on the first prototype.
Cutting, assembling of parts, following design.

Feb. 1, 2021 8.00 Time - Hours Done by Tibi

Worked on the first prototype.
Cutting, assembling of parts, following design.

Work - Manual: 80.00 Time - Hours due March 1, 2021

Low skills tasks.

Unassigned
Work events:
Feb. 15, 2021 0.50 Time - Hours Done by Alex Dicu

Recycled screws from previous prototype. With Tibi at the lab.

Work - Documenting: 30.00 Time - Hours due March 1, 2021

Write documentation about the design, prototype, process, make the work stigmergic.

document here
https://docs.google.com/document/d/1oxwqA1NBgCzqHZENyWePKUltOa8nx7eaM2-pIi_B5sk/edit

Unassigned
Work events:
March 25, 2021 1.00 Time - Hours Done by Tibi

Completed documentation for the fabrication assembly of the prototype. Mainly discussion on wood panels cover fabrication, some about the front and back panels. Updated bill of materials.

Feb. 15, 2021 1.50 Time - Hours Done by Alex Dicu

Documented findings after online shopping.
With Tibi at the lab.

Feb. 9, 2021 8.00 Time - Hours Done by Tibi

Compounded time for documentation, over two past weeks, an underestimate. All in the project doc.

Work - Shopping: 10.00 Time - Hours due March 1, 2021

Look for materials in local stores, get inspired, purchase.

Unassigned
Work events:
April 20, 2021 1.00 Time - Hours Done by Alex Dicu

Went with Tibi to buy a few more parts for the project at Home Depot and Reno Depot.

April 20, 2021 1.00 Time - Hours Done by Tibi

Went with Alex to buy a few more parts for the project at Home Depot and Reno Depot.

April 19, 2021 1.00 Time - Hours Done by Tibi

Went to buy a few more parts for the project at Home Depot

March 23, 2021 2.00 Time - Hours Done by Alex Dicu

Online shopping and went to buy rocks for the heater.

March 22, 2021 2.00 Time - Hours Done by Tibi

Wend to Addison to inquire about electrical cables, and to Canadian Tire.
Documented the choice. Still need to order online.

March 9, 2021 1.00 Time - Hours Done by Alex Dicu

Went shopping with Tibi for the aluminum bobble cover.

March 9, 2021 1.00 Time - Hours Done by Tibi

Went shopping with Alex for the aluminum bobble cover.

March 1, 2021 1.00 Time - Hours Done by Alex Dicu

Went to Reno depot to buy parts with Tibi

March 1, 2021 1.00 Time - Hours Done by Tibi

Went to Reno depot to buy parts with Alex

March 1, 2021 1.00 Time - Hours Done by Alex Dicu

Online shopping for thermal covers. Phone calls.

Feb. 17, 2021 2.00 Time - Hours Done by Tibi

Went to Reno Depot to buy materials, mostly wood.

Feb. 15, 2021 3.00 Time - Hours Done by Alex Dicu

Shopping for materials: rocks, blanket (exterior isolation), accessories and others. With Tibi at the lab.

Jan. 11, 2021 2.00 Time - Hours Done by Tibi

Went with Alex to look for materials in different hardware and construction stores, find materials to adjust design to local suppliers and standards.

Jan. 11, 2021 2.00 Time - Hours Done by Alex Dicu

Went with Tibi to look for materials in different hardware and construction stores, find materials to adjust design to local suppliers and standards.

Usable Inputs

Equipment - Mechanical - Power tools: 1.00 Each due Jan. 1, 2021
Onhand: Bev's Saw Table 1.00 Each
Onhand: Bev's Table Saw 2 2.00 Each
Onhand: Dremel 1.00 Each
Space Lab: 1.00 Area - square meters due Jan. 1, 2021
Onhand: Space - Frederic D's lab 200.00 Area - square meters
Onhand: Space - Makxim's lab 100.00 Area - square meters
Onhand: Space - Phil's lab 25.00 Area - square meters
Onhand: Space - SENSORICA Montreal lab 250.00 Area - square meters
Used: Space - SENSORICA Montreal lab 50.00 Time - Hours Feb. 1, 2021 by Portable Sauna
Onhand: Space - SENSORICA Robotics lab 1000.00 Area - square meters

Process context:

Pattern: Generic R&D
Context: Portable Sauna
Order: Work order 314 , Design and produce a portable sauna due: 2021-03-01

Previous processes:

Next processes:


Process notes: