Process: Green Wall prototype for the Sensorica lab starting 2019-01-11 ending 2019-01-31

If you were logged in and working on this process, you would log your work on this page.

Outputs

Scheduled:

Prototype 1.00 Each due Jan. 31, 2019
Design 1.00 Idea due Jan. 31, 2019
Completed: produces 1.00 Idea Jan. 11, 2019
  Resource: Design: Green Wall design - Sensorica lab prototype 1.00 Idea

Work

Planned Work: (Requirements are ordered by due date)

Work - Meeting: 1.00 Time - Hours due Jan. 11, 2019
Taken by Tibi
Work - Recruiting: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work - Facilitation and coordination: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work - Writing: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work - Information mining: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work events:
Jan. 22, 2019 1.00 Time - Hours Done by Tibi

Searched for air pumps, found more plant-based air purification projects, searched for open source communities and contacted one of them.

Work - R&D mechanics: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work events:
June 11, 2019 3.00 Time - Hours Done by Tibi

Completed the mechanical structure. Attached the vertical side panels to the base.

May 28, 2019 2.00 Time - Hours Done by Tibi

More testing of different ways to assemble the structure. Did some wood cuts, tried a new version, seams to be OK. Started to make a video, to document the entire process. To be published later.

Jan. 27, 2019 2.00 Time - Hours Done by Tibi

Made experimental single pot. self watering (wick) + fan integrated for air circulation for air purification through the roots. Sent pic to Bruce.
https://photos.app.goo.gl/cD6EptpTDBGtSy9h7

Jan. 23, 2019 0.70 Time - Hours Done by Tibi

Searched CNC wood joints on Internet, communicated with Daniel about the design, provided feedback on the first draft 3D model.

Jan. 11, 2019 3.00 Time - Hours Done by Bruce

Worked with Tibi at the Sensorica lab on design consideration of the green wall.

Jan. 11, 2019 3.00 Time - Hours Done by Tibi

Worked with Bruce at the Sensorica lab on design consideration of the green wall.

Work - Manual: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work - Documenting: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work events:
June 4, 2019 7.00 Time - Hours Done by Tibi

Worked on a video documenting the creation of the mechanical structure of the Green Wall. Videos have been taken during work. Now I put everything together into a summary video.
This involved transferring files, editing video, rendering video, 3 trials with slight modifications for improvement.
The video will be finished at a later date, some processes still need to be documented and inserted in the main video.

Jan. 15, 2019 1.00 Time - Hours Done by Tibi

Worked on the design doc: design considerations and design features for electronics, mechanics and software. Share it with the community.

Work - R&D electronics: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work events:
July 8, 2019 3.00 Time - Hours Done by John CC

Worked with John, under his supervision to configure the Green Wall minicomputer (orange pi zero). Documented the process. Not yet finished.

July 8, 2019 3.00 Time - Hours Done by Tibi

Worked with John, under his supervision to configure the Green Wall minicomputer (orange pi zero). Documented the process. Not yet finished.

Work - Shopping: 1.00 Time - Hours due Jan. 11, 2019
Unassigned
Work events:
Jan. 23, 2019 1.00 Time - Hours Done by Tibi

Online shopping - PVC pipe fittings, made a list / table in the design doc.
Bruce and I decided to work with 2" PVC pipes.

Jan. 11, 2019 1.50 Time - Hours Done by Tibi

Went with Bruce to Home Depot to identify parts for the green wall, after design session.

Jan. 11, 2019 1.50 Time - Hours Done by Bruce

Went with Tibi to Home Depot to identify parts for the green wall, after design session.

Citations

Design

Usable Inputs

Space Lab: 1.00 Area - square meters due Jan. 11, 2019
Onhand: Space - Frederic D's lab 200.00 Area - square meters
Onhand: Space - Makxim's lab 100.00 Area - square meters
Onhand: Space - Phil's lab 25.00 Area - square meters
Onhand: Space - SENSORICA Montreal lab 250.00 Area - square meters
Used: Space - SENSORICA Montreal lab 30.00 Time - Hours June 12, 2019 by LED green wall
Used: Space - SENSORICA Montreal lab 30.00 Time - Hours June 12, 2019 by LED green wall
Used: Space - SENSORICA Montreal lab 30.00 Time - Hours June 12, 2019 by LED green wall
Onhand: Space - SENSORICA Robotics lab 1000.00 Area - square meters

Process context:

Pattern: Generic R&D
Context: LED green wall
Order: Work order 281 , Green Wall prototype for the Sensorica lab due: 2019-01-31

Previous processes:

Next processes:


Process notes:

Design and prototype a green wall for the Sensorica lab.

We document the development here

https://docs.google.com/document/d/1y-k6o0i5y-kEWjnsvqxxM8-_L9KO8gnI9ZAsq0UWX48/edit#heading=h.kplafotfi4nr