Contributions for Project PV characterization
 
Date Type From Resource Type Qty URL Description Process Deliverables
May 12, 2016 Time Contribution Tibi Work - R&D electronics 4.00 HR Electronics debugging with Jim. Installing firmware, testing damaged martinez board. Milestone 3 - Electronics Assembly for PV characterization
May 12, 2016 Time Contribution Tibi Work - Demo 0.50 HR Created this video https://www.youtube.com/watch?v=yBvEC9h71TU Milestone 3 Write report
May 12, 2016 Time Contribution Tibi Work - Demo 0.50 HR Took pics of the finished prototype https://picasaweb.google.com/113604040352055118647/PVCharacterization Milestone 3 Write report
May 12, 2016 Time Contribution Jim Work - Shopping 0.50 HR Went to deliver package to FEDEX with Tibi. Used Tibi`s car. Milestone 3 - Mechanical Assembly for PV characterization
May 12, 2016 Time Contribution Tibi Work - Shopping 0.50 HR Went to deliver package to FEDEX with Jim. Used my car. Milestone 3 - Mechanical Assembly for PV characterization
March 30, 2016 Time Contribution Jim Work - Programming software 25.00 HR Finished alpha version front end in python. Added error checking for move and goto. Started coding scripting language. https://github.com/Sensorica/PVCharacterization/blob/master/PvforLinux.py Wrote arduino firmware for testing PV software commands over serial port. Forked file for running with Raspberry Pi serial port: https://github.com/Sensorica/PVCharacterization/blob/master/pv4pi.py Wireframe in Glade: https://github.com/Sensorica/PVCharacterization/blob/master/pv3.glade CSS stylesheet: https://github.com/Sensorica/PVCharacterization/blob/master/pv.css Milestone 3 - Programming for Product for PV characterization
Jan. 25, 2016 Time Contribution Daniel Work - Engineering 1.00 HR redesigned micromanipulator knobs and printed them Milestone 3 - Mechanical Assembly for PV characterization
Jan. 20, 2016 Time Contribution Tibi Work - R&D mechanics 4.00 HR Inspection, refinement and assembly of micromanipulators, sample clamp. Painting of parts with robber spray. Helped in the design of the sample box. Assisted Daniel for 3D printing other parts that needed refinement. Milestone 3 - Mechanical Assembly for PV characterization
Jan. 20, 2016 Time Contribution Tibi Work - Shopping 0.70 HR Went to the store to buy spray paint for the prototype, recommended by Jim. Milestone 3 - Mechanical Assembly for PV characterization
Jan. 20, 2016 Time Contribution Tibi Work - Engineering 2.00 HR Assisted Jim with soldering parts for the electronic assembly. Milestone 3 - Electronics Assembly for PV characterization
Jan. 19, 2016 Receive Tibi Currency - Canadian Dollars 18.00 CAD paid cash, to buy spray for some parts for the prototype.
Jan. 19, 2016 Receive YanickV Currency - Canadian Dollars 2.00 CAD Open
Jan. 19, 2016 Give YanickV Currency - Canadian Dollars 2.00 CAD Open
Jan. 19, 2016 Give Tibi Currency - Canadian Dollars 18.00 CAD paid cash, to buy spray for some parts for the prototype.
Jan. 13, 2016 Time Contribution Jim Work - R&D electronics 4.00 HR Electronics debugging with Tibi. Installing firmware, testing damaged martinez board. Milestone 3 - Electronics Assembly for PV characterization
Jan. 12, 2016 Time Contribution Daniel Work - Engineering 3.00 HR re-assembled the micromanipulators with the new knobs and inverted lead screws Milestone 3 - Mechanical Assembly for PV characterization
Jan. 12, 2016 Time Contribution Daniel Work - Engineering 3.00 HR re-assembled the micromanipulators with the new knobs and inverted lead screws Milestone 3 - Mechanical Assembly for PV characterization
Jan. 10, 2016 Time Contribution Daniel Work - Engineering 5.00 HR re-designed the Active Support part and the Active Bracket part to accomodate the new bigger motor, and re-printed them Milestone 3 - Mechanical Assembly for PV characterization
Jan. 6, 2016 Time Contribution Jim Work - Programming software 3.00 HR Set up raspberry pi with raspbian jessie and set up dependencies to run PV software Milestone 3 - Programming for Product for PV characterization
Jan. 5, 2016 Time Contribution Jim Work - Programming software 10.00 HR Attempted to modify martinez firmware to incorporate BNO055 IMU https://github.com/Sensorica/PVCharacterization/tree/bno055 Verdict. The IMU included with the board is to deeply rooted in the firmware and would require a complete overhaul Milestone 3 - Programming for Product for PV characterization
Jan. 5, 2016 Time Contribution Jim Work - Programming software 16.00 HR Started coding front end in python: https://github.com/Sensorica/PVCharacterization/blob/master/PvforLinux.py Wireframe in Glade: https://github.com/Sensorica/PVCharacterization/blob/master/pv2.glade CSS stylesheet: https://github.com/Sensorica/PVCharacterization/blob/master/pv.css Milestone 3 - Programming for Product for PV characterization
Nov. 24, 2015 Time Contribution Abran Work - Writing 4.00 HR Worked with Tibi to create user manual for building PV project device. Milestone 3 Write report
Nov. 23, 2015 Time Contribution Jim Work - Writing 0.00 HR Create a comprehensive report to close Milestone 3. This report will be used in Milestone 4, to inform the Prototyping phase. The report should be sent to Joshua Pearce from Queen's University at the end of this milestone. See more on the description on the right. Milestone 3 Write report
Nov. 23, 2015 Time Contribution Jim Work - Writing 0.00 HR Create a comprehensive report to close Milestone 3. This report will be used in Milestone 4, to inform the Prototyping phase. The report should be sent to Joshua Pearce from Queen's University at the end of this milestone. See more on the description on the right. Milestone 3 Write report
Nov. 20, 2015 Time Contribution Tibi Work - Writing 3.50 HR worked with Abran and Daniel on documentation, mostly on the manual for fabrication and assembly manual https://docs.google.com/document/d/1o1QAPUSpa7ntSQFpd5Np_rYqoh94Js8wzjdhpOLJxOM/edit Milestone 3 Write report