Contributions for Project iPot
 
Date Type From Resource Type Qty URL Description Process Deliverables
July 16, 2015 Time Contribution AlainG Work - Outreach-Marketing 3.00 HR Worked with Tibi on the video to be made for the iPot with 99media. Tammy and Jim contributed too. Outreach for resources
July 16, 2015 Time Contribution Tammy Work - Outreach-Marketing 1.50 HR Worked with Tibi, Jim, and Alain on the video to be made for the iPot with 99media. Outreach for resources
July 16, 2015 Time Contribution Tibi Work - Outreach-Marketing 3.00 HR Worked with Alain on the video to be made for the iPot with 99media. Tammy and Jim contributed too. Outreach for resources
July 16, 2015 Time Contribution Jim Work - Outreach-Marketing 1.50 HR Worked with Tibi, Tammy and Alain on the video to be made for the iPot with 99media. Outreach for resources
July 9, 2015 Time Contribution Ahmed Work - Programming for product 0.00 HR This is a process for considering design characteristics for the software layer of the product. If this process if the product doesn't have any software. The output of this process is a link to the repository of the code, github or other. Product design stage
July 9, 2015 Time Contribution Ahmed Work - Programming for product 0.00 HR This is a process for considering design characteristics for the software layer of the product. If this process if the product doesn't have any software. The output of this process is a link to the repository of the code, github or other. Product design stage
July 8, 2015 Time Contribution Ahmed Work - Programming for product 0.58 HR Identifying basic functions for Arduino SW: 1- Stepper motor functions Identifying essential data structures for Arduino SW: Product design stage
June 25, 2015 Time Contribution Jim Work - Analysis and Strategy 2.00 HR Weekly meeting with Bruce and Alain Initial project development phase
June 24, 2015 Time Contribution Abran Work - Documenting 0.00 HR Work for mapping interest in the project. Every project must have a "Path to market" page associated with it. Open the project's Path to Market page and document who would be interested the product-idea, who would be interested in actively participating, or in sourcing the project, or in spreading the word about the project. To find the Path to market page use the website's search bar to search for the "name of the project" and "path to market". Mapping interest
June 18, 2015 Time Contribution Jim Work - Analysis and Strategy 3.00 HR Weekly meeting with Bruce, Alain, Murray Initial project development phase
June 4, 2015 Time Contribution Jim Work - Information mining 1.00 HR Tracked down suppliers for heatsinks for Water producing system. Entered them in BOM https://docs.google.com/spreadsheets/d/1fIOhQfU8nmybLk0qoaWFaiIzYLgbHc_JhEeKTTMgv8U/edit?usp=sharing Prototyping stage R&D report: Peltier water condenser
June 4, 2015 Time Contribution Tibi Work - Analysis and Strategy 5.00 HR Weekly meeting. Mostly planning. Initial project development phase
June 4, 2015 Receive Ilian Part Optical - Led 10.00 Each Ilian donated this for the development of the iPot project.
June 4, 2015 Give Ilian Part Optical - Led 10.00 Each Ilian donated this for the development of the iPot project.
June 4, 2015 Receive Jim Currency - Canadian Dollars 15.00 CAD
June 4, 2015 Time Contribution Jim Work - R&D electronics 10.00 HR With the help of grégory, designed and setup circuit , wrote arduino code and documented the light supplement system for the iPot https://docs.google.com/document/d/1uZmnSK7784tuYbURgKiHHVJ27W56htHb-1M-XVqXMZ0/edit?usp=sharing Prototyping stage R&D report: Peltier water condenser
June 4, 2015 Give Jim Currency - Canadian Dollars 15.00 CAD
June 4, 2015 Time Contribution Murray Work - Analysis and Strategy 4.00 HR Weekly meeting with Tibi, Bruce, Alain and Abran Initial project development phase
June 4, 2015 Time Contribution Abran Work - Analysis and Strategy 4.00 HR Weekly meeting with Tibi, Bruce, Murray and Alain Initial project development phase
June 4, 2015 Time Contribution Bruce Work - Analysis and Strategy 4.00 HR Weekly meeting with Tibi, Alain, Murray and Abran Initial project development phase
June 4, 2015 Time Contribution AlainG Work - Analysis and Strategy 4.00 HR Weekly meeting with Tibi, Bruce, Murray and Abran Initial project development phase
May 28, 2015 Time Contribution Marisa Work - Analysis and Strategy 5.00 HR Weekly meeting on business development and marketing, with 5 other affiliates (see logs here). Initial project development phase
May 28, 2015 Time Contribution Bruce Work - Analysis and Strategy 5.00 HR Weekly meeting on business development and marketing, with 5 other affiliates (see logs here). Initial project development phase
May 28, 2015 Time Contribution AlainG Work - Analysis and Strategy 3.00 HR developing project activities flow https://docs.google.com/spreadsheets/d/12K5R5lEk1WdLB4OiE2ZvSOH2kSA5p0MJCxz3AomszGc/edit#gid=321854768 Initial project development phase
May 28, 2015 Time Contribution AlainG Work - Analysis and Strategy 5.00 HR Weekly meeting on business development and marketing, with 5 other affiliates (see logs here). Initial project development phase