Sept. 3, 2014 |
Time Contribution |
Tibi |
Work - Meeting |
1.50 HR |
|
Meeting with Francois, Ivan and Denis from Fondation du Maire, to discuss about the 10K that they still have for us, and about Tactus.
|
|
|
Sept. 3, 2014 |
Time Contribution |
Tibi |
Work - Meeting |
0.75 HR |
Open
|
discussions with Francois Gonthier on the Mosquito SS4 problem, documented 2 possible leads and communicated to Francois.
|
|
|
Aug. 21, 2014 |
Time Contribution |
Tibi |
Work - Technician experimental |
2.00 HR |
|
Worked with Antonio on the Mosquito.
We reassembled the Mosquito in a different way. We used the Chinese photodiode with a MM fiber and ST connector, taking light from a splitter, placed after the PM photonics, in order to see if the fluctuations come from polarization.
The experiment was inconclusive, i.e. still measured background signal fluctuations when the transducer is connected to the Mosquito, probably due to feedback into the laser.
|
Test Optics Photonics of Mosquito SS4
|
Document - Study Mosquito Optics Photonics: Mosquito SS4 new development - Interns summer 2014
Document - Study Mosquito Optics Photonics: Testing SS4 Mosquito and comparing with Chinese Mosquito
|
Aug. 14, 2014 |
Time Contribution |
Tibi |
Work - Technician experimental |
4.00 HR |
|
Worked with Antonio on the Mosquito SS4. We did some new tests to solution the problems with signal fluctuation, after the meeting with Luis Renauld.
|
Test Optics Photonics of Mosquito SS4
|
Document - Study Mosquito Optics Photonics: Mosquito SS4 new development - Interns summer 2014
Document - Study Mosquito Optics Photonics: Testing SS4 Mosquito and comparing with Chinese Mosquito
|
Aug. 14, 2014 |
Time Contribution |
Tibi |
Work - Technician experimental |
4.00 HR |
|
Made 2 constriction transducers to test the Mosquito SS4
|
Test Optics Photonics of Mosquito SS4
|
Document - Study Mosquito Optics Photonics: Mosquito SS4 new development - Interns summer 2014
Document - Study Mosquito Optics Photonics: Testing SS4 Mosquito and comparing with Chinese Mosquito
|
Aug. 14, 2014 |
Time Contribution |
Tibi |
Work - Meeting |
0.75 HR |
|
Meeting with Luis Renauld for the PARIS grant, with Francois, Jonathan, and Antonio. He wanted to know how the Mosquito project is advancing, this is requirement for the grant.
|
|
|
Aug. 14, 2014 |
Time Contribution |
Tibi |
Work - Documenting |
2.50 HR |
Open
|
Documented my experiments with Antonio on Mosquito SS4.
|
|
|
Aug. 2, 2014 |
Time Contribution |
Tibi |
Work - Documenting |
0.33 HR |
Open
|
Some documentation for the Mosquito SS4
|
|
|
Aug. 1, 2014 |
Time Contribution |
Tibi |
Work - R&D optics |
1.50 HR |
|
Worked with Antonio on the Mosquito SS4.
We tested the Ne laser. We wanted to see if we can eliminate the noise or inversion of signal. We arrived at the conclusion that the circulator doesn't pass the red laser. So no light was detected at the exit of the photonic system, on the side of the transducer.
|
Test Optics Photonics of Mosquito SS4
|
Document - Study Mosquito Optics Photonics: Mosquito SS4 new development - Interns summer 2014
Document - Study Mosquito Optics Photonics: Testing SS4 Mosquito and comparing with Chinese Mosquito
|
July 17, 2014 |
Time Contribution |
Tibi |
Work - Documenting |
2.00 HR |
|
worked on documentation for the Mosquito SS4
|
|
|
July 2, 2014 |
Time Contribution |
Tibi |
Work - Technician experimental |
45.00 HR |
|
Helped Thiago to transfer the Mosquito program into his computer in order to have him test the prototype. We tested the software on his computer with the Mosquito and it worked. Mission was accomplished. Thiago is now independent to perform experiments, without needing me anymore.
|
Make Mosquito SS4 prototype
|
|
June 18, 2014 |
Time Contribution |
Tibi |
Work - Documenting |
0.75 HR |
Open
|
Helped Thiago (intern) with documentation, reformatted his doc and asked for more info here and there.
|
|
|
June 17, 2014 |
Time Contribution |
Tibi |
Work - R&D optics |
0.50 HR |
|
Tested the Mosquito SS4 in a box. The box was prepared by Antonio. I only had to test the optical signal. It doesn't work and I don't know why. I left notes in the R&D document and communicated to Jonathan, Antonio and Francois.
https://docs.google.com/document/d/1X1nXZc7z7xa2O0wzp41N_ZRRyT_WI-rI9MZySvPZf48/edit#heading=h.rf56nnjl35bv
|
Make Mosquito SS4 prototype
|
|
June 10, 2014 |
Time Contribution |
Tibi |
Work - R&D optics |
1.00 HR |
|
Helped Antonio to install the Mosquito SS4 and retest the photonics. this was required in order to continue the next step of evolution of the Mosquito SS4. See document Mosquito SS4 new development - Interns summer 2014
https://docs.google.com/document/d/1X1nXZc7z7xa2O0wzp41N_ZRRyT_WI-rI9MZySvPZf48/edit#heading=h.9z5qf9eeqv49
|
Test Optics Photonics of Mosquito SS4
|
Document - Study Mosquito Optics Photonics: Mosquito SS4 new development - Interns summer 2014
Document - Study Mosquito Optics Photonics: Testing SS4 Mosquito and comparing with Chinese Mosquito
|
June 10, 2014 |
Time Contribution |
Francois |
Work - Design Electronics |
1.00 HR |
|
Antonio, Jonathan, Tibi and Francois had a meeting on how to continue the Mosquito project.
It was decided to:
buy a PD circuit with integrated amplifier (TA- transimpedance amplifier)
measure light intensity signal to know what circuit to buy
choose circuit
use a DSP (microcontroller)
Timeframe and tasks
June 10:
test existing Mosquito
choose PD circuit.
|
Make Design Electronic Mosquito SS4
|
Design Electronic - Mosquito LD (laser): Mosquito SS4 Electronics Design
|
June 10, 2014 |
Time Contribution |
Tibi |
Work - Documenting |
0.50 HR |
Open
|
Created VAS entries and linked them to the new Mosquito SS4 document. communicated with the team to log their contributions right there. the idea is to make it easier for them to log their contributions. I also revised all opn processes for the Mosquito SS4 and made some cleanup.
|
|
|
June 3, 2014 |
Time Contribution |
Tibi |
Work - Training others |
0.75 HR |
|
Spent time with Antonio to pass my knowledge and knowhow about the Mosquito ss4, which we need to finalize and put in a box. We also discussed technical matters and planned for future work.
|
|
|
May 29, 2014 |
Time Contribution |
Tibi |
Work - Documenting |
3.00 HR |
Open
|
Created a document for the brazilian students for a clean start on new development on Mosquito SS4
|
|
|
April 25, 2014 |
Time Contribution |
Tibi |
Work - Training others |
0.50 HR |
|
Discussed with Antonio about Mosquito development. I told him about what I thought we need to develop in terms of electronics and we discussed about how to package the new Mosquito. I also showed him where to find all the info about recent work on the Mosquito that I did. We discussed around some R&D documents.
|
|
|
April 10, 2014 |
Time Contribution |
Tibi |
Work - R&D optics |
4.00 HR |
|
Tested different transducers and displacement signal.
Joint-type and microfiber. The SS4 seems to be more sensitive than the Chinese mosquito, we believe this is related to the diameter of the core, SM vs MM.
The first tested microfiber transducer did not work.
https://docs.google.com/document/d/1xu_6UYcsexzCR3vNN8aCpWTp9Sp3pbd_DoThFiklI1A/edit
|
Test Optics Photonics of Mosquito SS4
|
Document - Study Mosquito Optics Photonics: Mosquito SS4 new development - Interns summer 2014
Document - Study Mosquito Optics Photonics: Testing SS4 Mosquito and comparing with Chinese Mosquito
|
April 8, 2014 |
Time Contribution |
Tibi |
Work - R&D optics |
4.00 HR |
|
Worked with Jonathan, made first measurements comparing signal noise
|
Test Optics Photonics of Mosquito SS4
|
Document - Study Mosquito Optics Photonics: Mosquito SS4 new development - Interns summer 2014
Document - Study Mosquito Optics Photonics: Testing SS4 Mosquito and comparing with Chinese Mosquito
|
March 31, 2014 |
Time Contribution |
Tibi |
Work - R&D optics |
2.00 HR |
|
Assembled the Mosquito SS4 on the optical table.
|
Make Mosquito SS4 prototype
|
|
March 31, 2014 |
Time Contribution |
Jonathan |
Work - R&D electronics |
3.00 HR |
|
Repaired Frederic's Mosquito SS4 driver.
|
Make Mosquito SS4 prototype
|
|
March 13, 2014 |
Time Contribution |
NicolasJF |
Work - Office |
1.00 HR |
|
log data into value account system with Tibi
|
|
|
March 13, 2014 |
Time Contribution |
NicolasJF |
Work - Documenting |
3.00 HR |
Open
|
Documentation
|
|
|