Oct. 6, 2014 |
Time Contribution |
Tibi |
Work - Accounting and Finance |
0.75 HR |
|
rearranged vas for manipulators project, distributed contributions/events into different sub-projects
|
|
|
Oct. 5, 2014 |
Time Contribution |
Tibi |
Work - Accounting and Finance |
0.75 HR |
Open
|
Restructured VAS for Manipulators sub-projects. I had to take all the processes and edit their projects. Manipulators have been split into many sub-projects and this is why I had to reassign project to every process. Otherwise all processes would be under one project, Manipulators and we don;t have a way to split revenue if we generate some in one sub-project only. I also updated the VAS page on the SENSORICA website.
|
|
|
Sept. 10, 2014 |
Time Contribution |
Tibi |
Work - Analysis and Strategy |
1.33 HR |
Open
|
Updated Path to Market page.
|
|
|
Jan. 30, 2014 |
Time Contribution |
Tibi |
Work - Technician experimental |
2.00 HR |
|
Worked on the prototype III
https://docs.google.com/document/d/1XLrD_v9Dzb44Z3LHlM3RX1UnG22Lh_Sww4oyrUSrMyc/edit#heading=h.fcvvdjm56hk5
|
Prototype Low cost, long range piezo stack
|
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v2
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v1
|
Jan. 29, 2014 |
Time Contribution |
Francois |
Work - Office |
1.00 HR |
|
emails follow-up with Hijri lab for demo
|
|
|
Jan. 29, 2014 |
Time Contribution |
Tibi |
Work - Technician experimental |
4.00 HR |
|
Worked on the prototype III
https://docs.google.com/document/d/1XLrD_v9Dzb44Z3LHlM3RX1UnG22Lh_Sww4oyrUSrMyc/edit#heading=h.fcvvdjm56hk5
|
Prototype Low cost, long range piezo stack
|
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v2
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v1
|
Jan. 27, 2014 |
Time Contribution |
Francois |
Work - Meeting |
1.50 HR |
|
chose website template with Ivan following Fernanda's selection.
|
|
|
Jan. 27, 2014 |
Time Contribution |
Francois |
Work - Meeting |
1.00 HR |
|
discussed with Antonio and Ivan about what to do for the micromanipulator.
|
|
|
Jan. 21, 2014 |
Time Contribution |
Antonio |
Work - Technician experimental |
6.28 HR |
|
Assembly and test
21/01/2014
Testing the piezo buzzers
https://docs.google.com/spreadsheet/ccc?key=0AvKN6G919YgndEEyamtKX1ZFU0Zkb1pIUTdFS2hybWc&usp=drive_web#gid=5
20/01/2014
Connectorizing the disks, the Positive points need to be solder using conductive epoxy because the conductive film doesn't support the heat. The negative points can be soldered without major problem.
|
Prototype Low cost, long range piezo stack
|
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v2
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v1
|
Jan. 20, 2014 |
Time Contribution |
Francois |
Work - Analysis and Strategy |
2.00 HR |
Open
|
micromanipulator marketing/distributor strategy with Yasir
|
|
|
Jan. 20, 2014 |
Time Contribution |
Francois |
Work - Meeting |
0.50 HR |
Open
|
meeting with Antonio about stack drift and Cedrat option
|
|
|
Jan. 20, 2014 |
Time Contribution |
Antonio |
Work - Technician experimental |
2.00 HR |
|
Assembly and test
20/01/2014
Connectorizing the disks, the Positive points need to be solder using conductive epoxy because the conductive film doesn't support the heat. The negative points can be soldered without major problem.
|
Prototype Low cost, long range piezo stack
|
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v2
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v1
|
Jan. 17, 2014 |
Time Contribution |
Francois |
Work - Office |
1.50 HR |
|
more coordination than office work: emails including about chinese manipulators, registration to ERA-Can
|
|
|
Jan. 17, 2014 |
Time Contribution |
Francois |
Work - Meeting |
2.00 HR |
|
discussion with Antonio and Jonathan about piezo new options, what's next, low-cost design, translation speed.
|
|
|
Dec. 31, 2013 |
Time Contribution |
Tibi |
Work - Technician experimental |
4.00 HR |
|
Worked on prototype V2. Assembled 3 buzzers using new connectors. I also tried different methods for soldering the buzzers to the metal connectors. The solution implemented was to use an epoxy. It's not perfect, more work needs to be done in this area.
|
Prototype Low cost, long range piezo stack
|
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v2
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v1
|
Dec. 31, 2013 |
Time Contribution |
Tibi |
Work - Technician experimental |
6.00 HR |
|
Created this first prototype from the cited design, tested it and communicated the results to SENSORICA and through social media.
|
Prototype Low cost, long range piezo stack
|
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v2
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v1
|
April 17, 2013 |
Time Contribution |
Daniel |
Work - R&D mechanics |
10.00 HR |
|
|
Create Prototype Piezo Actuator 3 ax V1 (stack+tube)
|
Prototype Mechanical - Manipulator actuator mechanical: Prototype Piezo Actuator 3 ax V1 (stack+tube)
|
April 2, 2013 |
Time Contribution |
Tibi |
Work - R&D electronics |
1.50 HR |
|
Discussed with FRederic Cantin about the Piezo device, showed him what was done, all docs, experiences, etc. I also explained him how this device will be used with the Mosquito.
|
|
|
March 22, 2013 |
Time Contribution |
Jonathan |
Work - Meeting |
1.00 HR |
|
• Piezo Meeting
|
|
|
March 8, 2013 |
Time Contribution |
Tony |
Work - Outreach-Marketing |
5.00 HR |
Open
|
I looked for prices on various micromanipulators. I found that most products out there in the market are more expensive than ours.
|
|
|
March 6, 2013 |
Time Contribution |
Tony |
Work - Outreach-Marketing |
6.00 HR |
|
I read up on the XYZ piezo micromanipulator, and conducted some basic market research and recorded some data. I have contacted some vendors for quotas.
|
|
|
Feb. 27, 2013 |
Receive |
Francois |
Currency - Canadian Dollars |
12.41 CAD |
|
Converted from spreadsheet
|
|
|
Feb. 27, 2013 |
Give |
Francois |
Currency - Canadian Dollars |
12.41 CAD |
|
Converted from spreadsheet
|
|
|
Feb. 19, 2013 |
Time Contribution |
Jonathan |
Work - R&D electronics |
5.50 HR |
|
Modifying Piezo PCB
|
|
|
Feb. 18, 2013 |
Time Contribution |
Jonathan |
Work - Design Electronics |
2.75 HR |
|
Peizo pcb
|
|
|