Contributions for Project Manipulators
 
Date Type From Resource Type Qty URL Description Process Deliverables
Oct. 6, 2014 Time Contribution Tibi Work - Accounting and Finance 0.75 HR rearranged vas for manipulators project, distributed contributions/events into different sub-projects
Oct. 5, 2014 Time Contribution Tibi Work - Accounting and Finance 0.75 HR Open Restructured VAS for Manipulators sub-projects. I had to take all the processes and edit their projects. Manipulators have been split into many sub-projects and this is why I had to reassign project to every process. Otherwise all processes would be under one project, Manipulators and we don;t have a way to split revenue if we generate some in one sub-project only. I also updated the VAS page on the SENSORICA website.
Sept. 10, 2014 Time Contribution Tibi Work - Analysis and Strategy 1.33 HR Open Updated Path to Market page.
Jan. 30, 2014 Time Contribution Tibi Work - Technician experimental 2.00 HR Worked on the prototype III https://docs.google.com/document/d/1XLrD_v9Dzb44Z3LHlM3RX1UnG22Lh_Sww4oyrUSrMyc/edit#heading=h.fcvvdjm56hk5 Prototype Low cost, long range piezo stack Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v2
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v1
Jan. 29, 2014 Time Contribution Francois Work - Office 1.00 HR emails follow-up with Hijri lab for demo
Jan. 29, 2014 Time Contribution Tibi Work - Technician experimental 4.00 HR Worked on the prototype III https://docs.google.com/document/d/1XLrD_v9Dzb44Z3LHlM3RX1UnG22Lh_Sww4oyrUSrMyc/edit#heading=h.fcvvdjm56hk5 Prototype Low cost, long range piezo stack Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v2
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v1
Jan. 27, 2014 Time Contribution Francois Work - Meeting 1.50 HR chose website template with Ivan following Fernanda's selection.
Jan. 27, 2014 Time Contribution Francois Work - Meeting 1.00 HR discussed with Antonio and Ivan about what to do for the micromanipulator.
Jan. 21, 2014 Time Contribution Antonio Work - Technician experimental 6.28 HR Assembly and test 21/01/2014 Testing the piezo buzzers https://docs.google.com/spreadsheet/ccc?key=0AvKN6G919YgndEEyamtKX1ZFU0Zkb1pIUTdFS2hybWc&usp=drive_web#gid=5 20/01/2014 Connectorizing the disks, the Positive points need to be solder using conductive epoxy because the conductive film doesn't support the heat. The negative points can be soldered without major problem. Prototype Low cost, long range piezo stack Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v2
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v1
Jan. 20, 2014 Time Contribution Francois Work - Analysis and Strategy 2.00 HR Open micromanipulator marketing/distributor strategy with Yasir
Jan. 20, 2014 Time Contribution Francois Work - Meeting 0.50 HR Open meeting with Antonio about stack drift and Cedrat option
Jan. 20, 2014 Time Contribution Antonio Work - Technician experimental 2.00 HR Assembly and test 20/01/2014 Connectorizing the disks, the Positive points need to be solder using conductive epoxy because the conductive film doesn't support the heat. The negative points can be soldered without major problem. Prototype Low cost, long range piezo stack Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v2
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v1
Jan. 17, 2014 Time Contribution Francois Work - Office 1.50 HR more coordination than office work: emails including about chinese manipulators, registration to ERA-Can
Jan. 17, 2014 Time Contribution Francois Work - Meeting 2.00 HR discussion with Antonio and Jonathan about piezo new options, what's next, low-cost design, translation speed.
Dec. 31, 2013 Time Contribution Tibi Work - Technician experimental 4.00 HR Worked on prototype V2. Assembled 3 buzzers using new connectors. I also tried different methods for soldering the buzzers to the metal connectors. The solution implemented was to use an epoxy. It's not perfect, more work needs to be done in this area. Prototype Low cost, long range piezo stack Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v2
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v1
Dec. 31, 2013 Time Contribution Tibi Work - Technician experimental 6.00 HR Created this first prototype from the cited design, tested it and communicated the results to SENSORICA and through social media. Prototype Low cost, long range piezo stack Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v2
Prototype Mechanical - Manipulator actuator mechanical: Prototype 1ax (buzzer) stack low cost, long range v1
April 17, 2013 Time Contribution Daniel Work - R&D mechanics 10.00 HR Create Prototype Piezo Actuator 3 ax V1 (stack+tube) Prototype Mechanical - Manipulator actuator mechanical: Prototype Piezo Actuator 3 ax V1 (stack+tube)
April 2, 2013 Time Contribution Tibi Work - R&D electronics 1.50 HR Discussed with FRederic Cantin about the Piezo device, showed him what was done, all docs, experiences, etc. I also explained him how this device will be used with the Mosquito.
March 22, 2013 Time Contribution Jonathan Work - Meeting 1.00 HR • Piezo Meeting
March 8, 2013 Time Contribution Tony Work - Outreach-Marketing 5.00 HR Open I looked for prices on various micromanipulators. I found that most products out there in the market are more expensive than ours.
March 6, 2013 Time Contribution Tony Work - Outreach-Marketing 6.00 HR I read up on the XYZ piezo micromanipulator, and conducted some basic market research and recorded some data. I have contacted some vendors for quotas.
Feb. 27, 2013 Receive Francois Currency - Canadian Dollars 12.41 CAD Converted from spreadsheet
Feb. 27, 2013 Give Francois Currency - Canadian Dollars 12.41 CAD Converted from spreadsheet
Feb. 19, 2013 Time Contribution Jonathan Work - R&D electronics 5.50 HR Modifying Piezo PCB
Feb. 18, 2013 Time Contribution Jonathan Work - Design Electronics 2.75 HR Peizo pcb